****JavaScript based drop down DHTML menu generated by NavStudio. (OpenCube Inc. - http://www.opencube.com)****
Some finishing touches to the drive-up lanes.
The drive-up lanes with gable sign above.
The new lobby-finished!
The drive-up lanes are being graded in preparation for paving.
The new wall sign on the front of the branch.
Brickwork done and exterior mostly finished.
A couple of the new offices.
Another view of the lobby.
This is the lobby-looking in from the door.
The drive-thru canopy is coming along.
Workers laying blocks along the base of the building.
North side of the building - work being done.
Now we have most of a roof! Exciting!!!
This is what will be the interior from the west side of the building, from what will be the conference room.
They are starting to raise the roof!
A view of the entire building from the southwest corner.
The finished product!
▪
Home Banking
▪
Newsletter Archive
▪
Surcharge Free ATM's
▪
Apply for a Loan Online
▪
Auto Center
▪
Online Calculators
▪
VISA Card Access
Information Desk
Products
Services
Rates & Fees
Membership
Contact Us
What's New
Home